Timber frame extension

Timber framed extensions keep on coming

Well seeing as we are all stuck indoors for a while though I would post some picture of our most recent project below we can see work on a new extension stating the project is a timber framed extension with large slide and fold doors with a roof lantern.

Mini digger excavation for new foundations
Mini digger excavation for new foundations

We were commissioned to build a single story timber framed extension with massive slide and fold doors.

Shuttering ready for concrete
Shuttering ready for concrete pour

The shuttering you can see helps us keep the required width 450mm and the required depth 750mm and keeps a nice straight line and you might also spot the laser in the back ground this means the shuttering goes in level within 0.3mm tidy hey.

Concentre pored and shutters removed
Concentre pored and shutters removed

Here we can see the foundation with the shutters removed to show the correct width, depth and levelled in correctly.

Joist with vents
Joist with vents

Here we can see the first layer of blinding before the Dpm goes down we can also see the brick vents to provide ventilation for the floor

brick work with timber frame
Brick work with timber frame

Here we can see the brickwork installed and the timber frame sitting on the sole plate.

 

Joists installed
Joists installed

Here we can see the 9 inch brick wall backfilled with Dpm and a blinding of sand and cement onto of a 2000gsm membrane the joists sit in hangers with Dpm behind them so stop moisture ingress.

Call Now Button