About the project Date: 2020 Client: Stuart Category: Defoe Road Address: Defoe RD Project Information Loft finished with double glazed windows and downlights and light switches all working and tested to 18th edition Loft finished with double glazed windows and downlights Here we can see the room finished with with double glazed windows and downlights UPVC windows Downlights Decoration Post navigation Previous PortfolioStairs with sun light and switch installed Next PortfolioLoft finished with fully fitted wardrobes
Stairs with sun light and switch installed Stairs with sun light and switch installed decorated by the client for a beautiful transition into the loft area Read More
Stairs fitted with spindles and balustrades Here see the stairs fitted leading to the third floor of the new loft space which makes a lot of room for the growing family Read More
Loft plastered with side by side Keylite windows Loft plastered with side by side Keylite windows Read More
Rear dormer being built Here we can see the loft rear dormer framwork being erected we can normally have this built within afew days and water tight within a week. Read More