About the project Date: 2020 Client: Sma Category: Defoe Road Address: Defoe rd Project Information Loft plastered with side by side Keylite windows Loft plastered with side by side Keylite windows Here we can see the loft fully plastered with side by side Keylite windows Sun light Roof windows En-suite Post navigation Previous PortfolioLoft completed with sail cloth hardiplank Next PortfolioRear dormer being built
Mulitfoil fitted with PIR insualtion to new flat dormer Mulitfoil fitted with PIR insualtion to new flat dormer we can also see the lecetrican testing his curcuits before plaster boarding Read More
Rear dormer being built Here we can see the loft rear dormer framwork being erected we can normally have this built within afew days and water tight within a week. Read More
Stairs fitted with spindles and balustrades Here see the stairs fitted leading to the third floor of the new loft space which makes a lot of room for the growing family Read More
Loft finished with small cup board door Loft finished with small cup board door two side by side velux and fire doors Read More