About the project Date: 2020 Client: Ed Category: Defoe Road Address: Defoe rd Project Information Roof stripped with new membrane going on Roof stripped with new membrane going on Here we can see the loft front being stripped for new velux extra timbers leadwork and membrane `Framework Roof windows leadwork Post navigation Previous PortfolioRear dormer being built Next PortfolioStairs fitted with spindles and balustrades
Rear dormer being built Here we can see the loft rear dormer framwork being erected we can normally have this built within afew days and water tight within a week. Read More
Stairs fitted with spindles and balustrades Here see the stairs fitted leading to the third floor of the new loft space which makes a lot of room for the growing family Read More
Loft finished with double glazed windows and downlights Loft finished with double glazed windows and downlights Read More
Loft plastered with side by side Keylite windows Loft plastered with side by side Keylite windows Read More
Loft finished with small cup board door Loft finished with small cup board door two side by side velux and fire doors Read More