About the project Date: 2016 Client: Tom Address: Kesgrave Project Information Loft insulated with multifoil and studwork being erected Loft insulated with multifoil and studwork being erected Here we can see the loft being insulated with multifoil and studwork being erected Multifoil Roof windows Studwork Post navigation Previous PortfolioPitched dormers under construction Next PortfolioDouble wind stairs being installed