Portfolio

Here we can erection of the timber frame with mansard dormers

Here we can see first floor engineered timber joists ready for decking

Here we a can see Priory rd completed

Here we can see the existing roof being dismantled with the gable end wall still intact which was replaced with stud work and exterior boarding.

Here we can see the erection of the attic trusses and the new gable end wall from the rear of the property

Here we a can see the roof from the rear completely covered in ready fro vellum and tiling

Here we can see the inside of the conversion with I beams and gulelams installed before the removal of the fink trusses

Here we can see the inside of the conversion with I beams installed and timber floors down and fink trusses removed

Here we a can see the Ibeams being installed with crane to do this only the first three tiles need to be removed to slide them in.

Here we can see the creation of the first pitched dormer there were five in total to be constructed.

Here we can see three pitched dormers with windows in equally spaced and ready to be clad

Here we a can see the three dormers completed with scaffold ready to be taken down

Here we can see the gluelam beams and the joisting between insulated floor with flooring

Here we can see the flat dormer constructed insulated and multi foiled to get u values

Inside of the room plastered with flat dormer

Complete loft conversions carried out all of the work on this flat dormer conversion here we can see the construction of the dormer.

Here we can see the completed flat dormer there is also en-suite inside the flat dormer, the clients were extremely happy with the results.

Completed inside of Pardoe place before decoration.

Here we can see the oak A frames being built by hand

Here we can see the oak frame ready to take the rafter fro roof

Stoke Ash three separate roof joined

Here we can see the timber frame sole plate ready to take timber frame

Here we can see the foundation with inner and outer skin walls in construction

Here we can see the timber frame ready for triple glazed windows

Here we can see the roof being built onto of the windows

Here we can see inside of the bay conversion with oak flooring

Here we can see the completed bay conversion with hardiplank cladding